Brief
|
|
|
Reducing capital expenditure is a natural response to low oil prices, as demonstrated by the oil and gas industry deferring or canceling $200 billion worth of planned investments over the past two years. Another $1.5 trillion of future spending may be uneconomic at current oil prices. As the industry establishes a new equilibrium between supply and demand, producers shift from high-cost plays (such as Arctic and ultra-deepwater) to more accessible, low-cost barrels (see Figure 2). In this low-cost world, it will be even more important to use capital as efficiently as possible. When oil was $100 per barrel, projects competed against each other for capital, but high returns meant that volume typically won over capital efficiency, resulting in a tripling of annual capex between 2003 and 2013. In the $50-per-barrel world, projects will increasingly struggle to return the cost of capital, so capital efficiency will be essential to get projects funded. Three fundamental trends to improve capital productivity Fortunately, oil and gas companies have room to raise their capital productivity, particularly for projects that are early in the life cycle. We see three broad trends that will fundamentally raise the productivity of capital over the coming decades: innovation, standardization and optionality. Innovation. Technology continues to evolve rapidly in oil and gas, improving capital productivity by delivering solutions that help producers deliver more efficiently. The technologies that helped make unconventional production economical over the past decade are the most obvious example. Floating liquefied natural gas (FLNG) platforms are another one. These structures will improve the economics of remote natural gas production as they begin to replace traditional onshore development projects. Advanced analytics will help, too, by improving the predictability of known drilling problems in well planning and execution. When oil prices are low, technology budgets come under severe pressure, so executives should take care not to damage their long-term capacity for innovation. Standardization. Industries such as automotive and manufacturing have worked to standardize their production processes, but that has not occurred in oil and gas. Consider subsea operators who still use 28 different shades of yellow to paint their equipment. Standardization improves capital productivity in several ways. First, simplifying and standardizing engineering designs helps prevent unnecessary customization and the urge to gold-plate solutions. One senior executive applies this test: If the new idea were to cost 10 times what the proponent says and the benefit were to be one-tenth of that claimed, would we still do it? Only changes passing the test are implemented. Second, the “design one, build many” concept has had some notable successes, with ExxonMobil’s deepwater developments in Angola often cited as the best example. The industry could do more under this concept—for example, in FLNG. Standardization also makes it easier for companies to collaborate and eliminate wasteful practices. This is especially true as most development over the next five years will be within known environments (since ultra-deepwater and the Arctic are mostly off the table at today’s oil prices), and companies can continue down the experience curve (see Figure 3). Optionality. For almost 20 years, the industry has worked with decision review gates and a sequential, converging process for project development: a review of conceptual options followed by front-end engineering of one selected option before making a final investment decision and commencement of a detailed design. This approach has served the industry well and should continue to do so. Today’s environment places pressure on that process. Markets are volatile, and innovation is accelerating rapidly. Pressure on capital productivity leaves less tolerance for long rework cycles, and if a project fails to pass a stage gate, that may be the end of it. We see two implications from this, both of which may require the judgement of more senior project development executives. First, companies can learn to make decisions based on imperfect but sufficient information. Too often, they overinvest in defining conceptual designs to reach an outcome that could have been decided more easily. Instead, they can reverse the logic and start with what would be needed for the project to fly. If the cost is off by billions, there’s no need to examine smaller details. Instead, they can move on to alternative concepts. Second, they should keep more options open in the early stages, pursuing multiple concepts in competition with each other. Suboptimal options should receive less attention, but the project should maintain a clear understanding of the assumptions underpinning that outcome and monitor the external environment for changes. None of this advocates for looser or schedule-driven early-stage development, which can be a train wreck. Project developers still need to make decisions based on value creation and with all due technical and commercial consideration. But projects can proceed with explicit treatment of uncertainty, taking a “wider funnel for longer” at the start with a flexible stage gate system, guided by an appropriately senior gatekeeper. Brian Murphy, a partner in Bain's Oil & Gas practice, outlines five action areas for oil and gas companies to implement capital projects in the most productive way. Putting capital productivity into motion These trends are well documented, but industry leaders will have to focus their efforts to ensure that they contribute to capital productivity within their organizations. Five principles can guide executives as they make capital decisions.
Working across all these principles, companies can reduce capex significantly. One major integrated oil company was able to reduce the capital spending costs of a major platform in the Gulf of Mexico by 36% through reengineering work that suggested better productivity was possible from using a subsea platform. In another example, a national oil company cut the time necessary for drilling a well by more than 40%, from 146 days to 83 days, by avoiding side efforts and focusing on better planning and execution. As executives work to improve their capital productivity in this low-price environment, they need to remain nimble, pairing the engineering and commercial mindsets where they can, managing the organization toward simplicity and standardization, and maintaining a healthy appetite for investment rather than deferment. Few forecasts suggest a strong price recovery in the medium term, so the need for capital productivity is here to stay. Lodewijk de Graauw and Brian Murphy are partners with Bain & Company in Perth. John McCreery is a Bain partner in Houston. All three work with Bain’s Global Oil & Gas practice, and Brian leads the practice in the Asia- Pacific region. ![]() ![]() ![]() |